Project:   The Airplane Factory - Sling TSi   -   VIEW REPORTS
Total Hours:1190.7
Start/Last Date:Dec 01, 2019 - Jan 29, 2023
Engine:Rotax 915is
Panel:Garmin 3X
 
Friendly URL: https://eaabuilderslog.org?s=MattJ

Home or Last Project Picture

Dec 09, 2020     Prefit Center Consol - (3 hours)       Category: Interior Finish
12/09/2020

TAF Engineering confirmed the center console bracket that was mounted by TAF in the quickbuild was, indeed, too long. I thought since the M4 rivnuts match up I could trim the bracket to size. The problem became evident that I could not to that because 2 of the rivet holes that were drilled into the misinformed bracket just set up right next to the holes I would have had to drill. I will just wait for the new bracket.


12/02/2120

I pre-fit the center console skins and found an issue with the Quick Build. The center support appears to be too long by 19 mm. In looking the base that was attached I may just be able to drill out rivets and shorten the structure by the proper amount and rivet back to the base.


 